Between Joist
Between joist is commonly used in renovations where the floor level cannot be increased.
Dry sand cement method
Each joist needs to be notched at one end within 120mm of the perimeter wall to allow the pipe to pass through. The pipe is held in place using the supplied pipe staples. Pipe spacing is generally 100mm from perimeters and 200mm centres. The additional weight is generally within the joist capacity, but if you are unsure, please check with us.
Aluplate Fit from above method
Aluplate Fit from below method